The Design-Build aspect for the steel industry is a major influence in the marketplace, PSDESIGN is well equipped to handle such projects.

A fast track example below is based on a 50 ton project scenario:

  • Meet with customer through fabricator to understand the project.
  • Present a 3D basic model of the project.
  • Upon customer approval begin engineer/design of the scope.
  • While being engineered, detailing is being done in concert.
  • ¬†Drawings completed for fabrication
  • ¬†Have steel on site to begin construction within 8-12 weeks of initial walk-down.

All the above, is based upon the approval process going smoothly and quickly to expedite the process for the customer.